PORTSMOUTH POWER PLANT

Sitrep One and Final

8 April, 1999

These reports describe significant environmental incidents reported to and tracked by the National Response Center. They reflect both new incidents and follow-up information describing actions taken for previously reported events. The NRC publishes Incident Summary Reports periodically upon receipt of documentary information from the Federal On-Scene Coordinator.

Occurence Date: 8 April
Location: Portsmouth, OH
Source: 3 Facet Transformers
Material: Mineral Oil
Severity: Medium
Quantity Discharged: 9500 Gallons
Quantity in Water: Unknown
Body of Water Affected: Unnamed Ditch
Federal On-Scene Coordinator: EPA REGION V

On Thursday, April 8, 1999, a 3 Facet transformers on the Portsmouth Power Plant leaked. The material went into a ditch that leads into a retention pond. The leak was stopped and a dam was made in the ditch. There is a possibility that the materials may have reached the pond. The plant stated they need no assistance. CASE CLOSED.